Inspection ledger

Four checks that stand between you and a country house

Every property in the dossier passes the same sequence: a physical cottage inspection, a utility availability review, an access road assessment, and a documentation check. Independent inspections before you commit.

  1. 01 Property inspection Structure, roof, water and wiring, logged with photo evidence and inspector initials.
  2. 02 Utility availability Grid, gas, water and sewerage status, plus a note that availability may change.
  3. 03 Access roads Surface, width and turning space, with seasonal notes for mud and snow.
  4. 04 Documentation Ownership, cadastral and permit papers reviewed in a structured checklist.

Inspection ledger

Four stages, each signed and dated

Every stage closes with an inspector initial and a verification date, so you can trace who checked what, and when.

  1. 01

    Structural inspection

    Foundation, load-bearing walls, roof covering and moisture readings recorded on site with dated photo evidence.

    Inspector O. MarchenkoVerified 12 Feb 2025Verified

  2. 02

    Utility availability review

    Gas capacity, electricity supply, water source and sewerage method checked against provider connection records.

    Inspector I. KovalchukVerified 18 Feb 2025Verified

  3. 03

    Road access assessment

    Surface condition, driveway width and seasonal passability noted for dry, mud and snow months.

    Inspector T. BondarVerified 21 Feb 2025Pending

  4. 04

    Documentation check

    Ownership title, cadastral number, permits and utility contracts reviewed for gaps before you commit.

    Inspector N. ShevchenkoVerified 26 Feb 2025Pending

Documentation support is an administrative review only and is not legal advice. Utility availability may change, so independent verification is recommended before purchase.

Utility Availability Matrix

Electricity, gas, water and internet, checked line by line

Each row is recorded during the inspection visit and signed off with the inspector initials and the verification date. Utility availability may change, so independent verification is recommended before you commit.

Utility status recorded per inspected cottage
Utility Status What we verify on site Evidence on file
Electricity Available Connection capacity, meter seal, distance to the nearest transformer, backup generator wiring. Meter photo, capacity note from the operator.
Gas Pending reply Distance to the main line, pressure statement, boiler and flue condition. On-site photo, operator reply outstanding.
Water Available Well debit, winterised supply, pressure at the tap, septic and drainage routing. Well test card, inspector initials and date.
Internet Not available Fibre route, mobile signal at roof height, line of sight to the nearest mast. Signal test sheet, mast distance note.

Utilities are only one part of the dossier. Read the access road assessment and the documentation checklist before you shortlist a property.

Step 3 of 4 · Road access

Road access notes, season by season

Road access assessments include seasonal notes, because a lane that is firm in August can be impassable in March. The condition line below marks each season with a visible text label, never colour alone, and the note field records what the inspector saw on the day of the visit.

Dry season

Graded surface, two-wheel drive is usually enough. Note gradient, wheel ruts and any spot that holds water after rain.

Mud season

Unpaved sections soften. Note drainage ditches, culvert condition and the last point a car can pass without a tractor.

Snow season

Note who clears the lane, how far the cleared stretch runs, and whether the final approach is ploughed at all.

Inspector O. Marchenko, initials OMDate 12 March 2025Evidence 6 photos, 1 PDF note

Next: documentation checklist

Dossier ledger

Documentation checklist

Four document groups, each carrying a status and the date our inspector last checked it on site. Utility availability may change, so independent verification is recommended before you commit.

Ownership✓ VerifiedLast verified 14 Mar 2025
  • Extract from the State Register of Real Property Rights✓ Verified14 Mar 2025
  • Seller title deed and purchase agreement✓ Verified14 Mar 2025
  • Liens, mortgages and court claims▲ Pending02 Apr 2025

Checked by inspector O. Kravets. Photos and scans filed in the dossier.

Cadastral records✓ VerifiedLast verified 09 Apr 2025
  • Cadastral number and boundary coordinates✓ Verified09 Apr 2025
  • Plot area matches the cadastral map✓ Verified09 Apr 2025
  • Designated use for housing construction✓ Verified21 Mar 2025

Checked by inspector I. Bondar against the public cadastral map.

Permits and construction▲ PendingLast verified 21 Feb 2025
  • Building permit or construction declaration✓ Verified21 Feb 2025
  • Certificate of acceptance for completed works▲ Pending21 Feb 2025
  • Setback and floor-area compliance✕ Missing21 Feb 2025

Checked by inspector O. Kravets. Documentation support is administrative, not legal advice.

Utilities and connections▲ PendingLast verified 02 Apr 2025
  • Electricity grid connection agreement✓ Verified18 Mar 2025
  • Gas supply contract and meter status▲ Pending02 Apr 2025
  • Water well permit or central supply connection✓ Verified18 Mar 2025

Checked by inspector I. Bondar. Confirm current tariffs and connection terms with the operator.

Utility details are also listed in the utility availability matrix. Shortlisting already? Open the property comparison table.